Cyclists in Spijkenisse spared disruption as bridge maintenance delayed
Cyclists in Spijkenisse can breathe easy—planned maintenance on the Spijkenisse Bridge cycle paths has been postponed due to overlapping roadworks. No new date has been set yet, but updates will follow.
| Key Detail | Information |
|---|---|
| Location | Spijkenisse Bridge, Zuid-Holland |
| Original Work Period | 23 March – 27 April 2026 |
| Reason for Delay | Overlapping work on the A15 motorway |
| Current Status | No disruption for cyclists |
| New Timeline | To be announced |
| Issuing Authority | Rijkswaterstaat |
Rijkswaterstaat is responsible for the management and maintenance of major roads and waterways in the Netherlands, including bridges and cycle paths. This includes ensuring safe and efficient infrastructure for both motorists and cyclists.
Openrijk is free and ad-free
Do you value our work? Help us stay online with a small contribution.
Read the full translated article below
Work on the Spijkenisse Bridge cycle paths postponed
Planned maintenance on the cycle paths near the bridge will not proceed for the time being. This was previously announced by Rijkswaterstaat. The work was originally scheduled to take place from Monday, 23 March to Monday, 27 April 2026.
Rijkswaterstaat had planned to replace the asphalt on the cycle paths on the bridge during this period. However, due to overlapping work on the A15 motorway, the project cannot go ahead. It is clear that the maintenance will still be carried out at a later date, though the exact timing has not yet been determined.
For cyclists, this means they can continue to use the existing cycle paths without disruption for the time being. Once more clarity is available regarding a new schedule, this will be communicated again.
