A12 IJssel Bridge closure starts April 7: expect major delays near Arnhem
From April 7 to May 14, major maintenance on the IJssel Bridge (A12 near Arnhem) will cause significant traffic disruptions. Road users should expect delays, lane closures, and a reduced speed limit. Plan ahead or use alternatives like public transport.
| Key Data | Details |
|---|---|
| Location | IJssel Bridge, A12 near Arnhem |
| Maintenance Period | April 7 – May 14, 2026 |
| Lanes Available | 2 lanes per direction (2 closed) |
| Speed Limit | 70 km/h |
| Expected Delays | Up to 1 extra hour of travel time |
| Additional Night Work | Asphalt repairs, possible full closures |
| Advice for Road Users | Avoid peak hours, work from home, use PT |
Rijkswaterstaat is responsible for the maintenance and safety of major Dutch highways and bridges, including the A12 IJssel Bridge. This work ensures the infrastructure remains safe and functional for all road users, though it often leads to temporary disruptions.
Instant happiness ☕
You happy with the news, we happy with coffee. Life can be that simple.
Read the full translated article below
Major maintenance on concrete IJssel Bridge begins April 7
From Tuesday, April 7 to Thursday, May 14, 2026, Rijkswaterstaat will carry out major maintenance on the concrete IJssel Bridge over the IJssel on the A12 near Arnhem. The maintenance is necessary to keep the bridge safe and fully accessible for all road users.
For the work, two lanes per direction will be closed. Two lanes per direction will remain available. A maximum speed limit of 70 km/h will apply.
Significant traffic disruption expected
Rijkswaterstaat expects significant traffic disruption in the region. It advises avoiding the A12 as much as possible. Plan your journey carefully and allow for approximately one extra hour of travel time.
Advice for road users
- Travel outside peak hours.
- Work from home if possible.
- Consider alternatives such as public transport, carpooling, or cycling.
Additional nighttime work ahead of maintenance
Due to the winter conditions over the past months, the road surface before and after the bridge has deteriorated faster than expected. Therefore, Rijkswaterstaat will carry out additional asphalt repair work ahead of the planned major maintenance.
To minimize disruption, these works will take place at night. During these nights, fewer lanes will be available, and at times, full nighttime closures will be necessary.
Planning of additional A12 works
You can find the current planning of the works on the Rijkswaterstaat project page.
More information
For more information about the project, visit the Rijkswaterstaat website.
Renovation animation of IJssel Bridges A12
By showing the video you accept the terms and conditions and privacy policy of Youtube.
