Rijkswaterstaat is performing maintenance on the N2 Ring Road Eindhoven. Expect additional travel time of up to 50 minutes.
The Ring Road Eindhoven is closed between junction Ekkersweijer and exit (30a) Meerhoven-Zuid towards Tilburg and Maastricht from Friday, June 20, 2025, 9:00 PM to Monday, June 23, 2025, 5:00 AM. The on-ramp (29) Eindhoven Airport to the N2 towards Maastricht will be closed earlier.
Closure
N2 Ring Road Eindhoven between junction Batadorp and exit (30a) Meerhoven-Zuid towards Maastricht
- on- and off-ramp (29) Eindhoven Airport
- exit (30) Eindhoven-Centrum
- on- and off-ramp (30a) Meerhoven-Zuid
Friday, June 20, 9:00 PM to Monday, June 23, 5:00 AM.
Extra Early Closures
On-ramp (29) Eindhoven Airport from the N2 towards Maastricht from Flightforum is closed from Friday, June 20, 8:00 PM.
On-ramp (29) Eindhoven Airport from the N2 towards Maastricht from Eindhoven Centrum is closed from Friday, June 20, 8:00 PM.
Detour Routes
Traffic towards Tilburg and Breda will be diverted via the A2 and N65.
Traffic towards Eindhoven Airport will be diverted via A58 exit Best, Erica, and Spottersweg towards Eindhoven Airport.
Traffic at junction Ekkersweijer:
- towards ring road N2 exit 22 to 32, (including Eindhoven-Airport) will be diverted via A2 towards Maastricht and A67 towards Antwerp, to then turn at A67 junction (31) Valkenswaard.
- towards Waalre will be diverted via A2 Maastricht and A67 towards Venlo, to then turn at A67 junction (34) Geldrop.
Traffic coming from Tilburg destined for Eindhoven Airport will be diverted via A58 exit Best, Erica, and Spottersweg towards Eindhoven Airport. Yellow signs will provide information on site about the work and traffic measures.
Weather-Sensitive Work
Maintenance work is weather-sensitive. In bad weather, the work may not proceed and will be rescheduled.
Regular Maintenance
This maintenance work falls under the Maintenance Contract of Rijkswaterstaat in Southern Netherlands. It involves regular maintenance that the road network, viaducts, bridges, and tunnels periodically require, such as asphalting, replacing expansion joints, and maintaining guardrails. The goal is to ensure smooth and safe traffic flow for road users.
Work: Safety First
Rijkswaterstaat works daily for smooth and safe traffic. For this, road workers and our road inspectors work day and night. Safety is paramount. You as a road user can also contribute to the safety of road workers and yourself: follow the instructions and respect the speed limit.
More information about work on the N2?